CCR Rule Compliance Data and Information
Brunner Island Ash Basin 6
Documents
- Brunner Island Ash Basin No. 6 CCR Rule Fugitive Dust Control Plan
- 2016 0118 Brunner AB6 2016 USEPA CCR Report and Appendices
- Brunner AB6 2016 Corrective Measures Taken
- Brunner AB6-20160929 2016 EPA Initial Structural Stability Assessment and Appendices
- Brunner AB6-201601011 Inflow Design Flood Control System Plan and Appendices
- Brunner AB6-20160927 Final 2016 Factor of Safety Report and Appendices
- Brunner AB6-Dam Failure and Hazard Potential Classification and Appendices_20160929
- Brunner AB6 FINAL CCR Closure Plan Sept 2016
- Brunner AB6 Liner Determination
- Brunner-Fugitive-Dust-Plan-Annual-Report-Basin-6-2015-2016-NOV-30-2016
- Brunner AB 6 History of Construction FINAL note: large file, may take additional time to load
- Brunner-AB6-2017-USEPA-CCR-Report-and-Appendices
- 2017-04-CCR-Certification-BI-AB6-EAP
- 2017-04-CCR-Brunner-AB6-EAP
- Brunner-Basin-6-Groundwater-Monitoring-System-Certification
- Brunner-Basin-6-Statistical-Method-Certification
- Brunner-AB6-Annual-Fugitive-Dust-Control-Report-Dec-2017-With-Attachments
- 2018-Talen-Brunner-Island-AB6-CCR-Rule-Annual-Inspection
- 2017 Annual Groundwater Monitoring And Corrective Action Report Basin 6 Brunner 180131
- 2018.03.17 Brunner Island AB6 EAP Meeting
- Brunner Ash Basin 6 Notification Establishment Assessment Monitoring
- Notification Of Constituents Avove Gwps 180815 Basin 6
- Brunner Island Basin 6 Fault Areas Report
- Brunner Island Basin 6 GW Location Restriction
- Brunner Island Basin 6 Seismic Impact Zones Report
- Brunner Island Basin 6 Unstable Areas Report
- Brunner Island Basin 6 Wetlands Location Restriction
- BI_Basin+6_Fault+Areas+Report
- BI_Basin+6_GW+Location+Restriction
- BI_Basin+6_Seismic+Impact+Zones+Report
- BI_Basin+6_Unstable+Areas+Report
- BI_Basin+6_Wetlands+Location+Restriction
- Brunner Island Ash Basin 6 Annual Fugitive Dust Control Report 2018
- Brunner Island Ash Basin 6 2019 Annual Inspection
- Brunner Island Ash Basin 6 Notification of Constituents Above GWPS November 2018 Sample Event
- Brunner Island Ash Basin 6 Notification of Initiation of Assessment of Corrective Measures
- Brunner Island Ash Basin 6 2018 Annual Groundwater and Corrective Action Report
- Brunner Island Ash Basin 6 2019.03.21 EAP Meeting
- Brunner Island Ash Basin 6 2019.05 CCR EAP Cert.
- Brunner Island Ash Basin 6 2018.03 Revision 1 EAP
- Brunner Island Ash Basin 6 Notice of Intent to Close
- Brunner Island Ash Basin 6 Assessment of Corrective Measures 06-12-19
- Brunner Island Ash Basin 6 Semi-Annual Corrective Measures Progress Report November 2019
- Brunner Island Ash Basin 6 Annual Fugitive Dust Control Report 2019
- Brunner Island Ash Basin 6 Annual Inspection Report 2020
- Brunner Island Ash Basin 6 Annual Groundwater and Corrective Action Report 2019
- Brunner Island Ash Basin 6 SemiAnnual Corrective Measures Progress Report 5202020
- Brunner Island Ash Basin 6 SemiAnnual Corrective Measures Progress Report November 2020
- Brunner Island Ash Basin 6 Annual Fugitive Dust Control Report 2020
- Brunner Island Ash Basin 6 Annual Inspection Report 2021
- Brunner Island Ash Basin 6 Annual Groundwater and Corrective Action Report 2020
- Brunner Island Ash Basin 6 2021.04.08 EAP Meeting
- Brunner Island Ash Basin 6 2021 May Semiannual Corrective Measures Progress Report
- Brunner Island Ash Basin 6 Statistics Certification Update Basin 6-4-2021
- Brunner Island Ash Basin 6 Periodic Structural Stability Assessment
- Brunner Island Ash Basin 6 2021 Brunner AB6 Periodic Inflow Design Flood Control System Plan and Appendices
- Brunner Island Ash Basin 6 Periodic Update to Dam Failure and Hazard Potential Classification
- Brunner Island Ash Basin 6 2021 November Semiannual Corrective Measures Progress Report
- Brunner Island Ash Basin 6 Annual Fugitive Dust Control Report 2021
- Brunner Island Ash Basin 6 Annual Groundwater and Corrective Action Report 2021
- Brunner Ash Basin 6 2022 BI AB6 EAP Meeting
- Brunner Ash Basin 6 Semiannual Corrective Measures Progress Report May 2022
- 2022 Talen BI AB6 Annual Inspection
- Brunner Island Ash Basin 6 2022 November Semiannual Corrective Measures Progress Report
- Brunner Island Ash Basin 6 Annual Fugitive Dust Control Report 2022
- Brunner Island Ash Basin 6 Annual Groundwater and Corrective Action Report 2022
- 2023 Brunner AB6 EAP CCR
- 2023 CCR Certification AB6 EAP
- 2023 BI AB6 EAP Meeting
- Brunner Island Ash Basin 6 Semiannual Corrective Measures Progress Report May 2023
- 2023 Talen BI AB6 Annual Inspection
- Brunner Island Ash Basin 6 Semiannual Corrective Measures Report November 2023
- Brunner Island Ash Basin 6 Annual Fugitive Dust Control Report 2023
- Brunner Island Ash Basin 6 Annual Groundwater Monitoring and Corrective Action Report 2023
- Remedy Selection Report Supplemental Abatement Plan
- 2024 BI AB6 EAP Meeting
- Brunner Island Ash Basin 6 Semiannual Corrective Measures Report May 2024
- 2024 Brunner Island Ash Basin 6 Closure Extension Demonstration and Certification
- Brunner Island Ash Basin 6 Notification of Constituents in Groundwater Above GWPS
- 2024 Brunner Island Ash Basin 6 Annual Inspection Report