CCR Rule Compliance Data and Information
Montour Ash Basin 1
Documents
- Montour Ash Basin 1 Fugitive Dust Control Plan
- 2016.01.18 Montour AB1 2016 Landfill Report and Appendix
- Montour AB1-150-989-0003-Initial Safety Factor Assessment Report Oct 2016
- Montour AB1-150-989.0005-Structural Stability Assessment Report
- Montour AB1-150-989.0006-Initial Inflow Design Flood Control System Plan – October 10 2016
- Montour AB1 –ClosurePlanCcrRuleBasin1October 2016
- Montour AB1-PostClosurePlanCcrRuleBasin1October 2016
- Montour AB1 Hazard Classification
- Montour AB1 Liner Determination
- 2016-Montour-Ash-Basin-No-1-Pipe-Cleaning-Corrective-Measures
- Montour Ash-Basin-1-Annual-Fugitive-Dust-Report
- Montour-AB1-2017-USEPA-CCR-Report-and-Appendices
- Montour AB1 2016 Corrective-Measures-Taken-for-Montour-Ash-Basin-No-1
- Montour-Basin-1-Statistical-Method-Certification-10-17-17
- Montour-Basin-1-Groundwater-Monitoring-System-Certification-10-17-17
- 2017-Montour-Ash-Basin-1-Annual-Fugitive-Dust-Control-Report
- 2018-Talen-Montour-CCR-AB1-Annual-Inspection
- 2018 Montour AB1 EAP Meeting Documentation
- Montour Ash Basin 1 Notification Establishment Assessment Monitoring
- 2017 Basin 1 Groundwater Monitoring And Corrective Action Report 180131 rev 180709
- SSL Notification Basin 1 GWPS Montour 181021
- Ash Basin 1 Annual Fug Dust Report 2018
- Montour Ash Basin 1 Montour Basin 1 Location Restriction 2018
- Montour+Basin+1+Location+Restriction+2018
- Ash Basin 1 2019 Annual Inspection
- Montour Ash Basin 1 2018 Groundwater Monitoring and Corrective Action Report
- Montour Ash Basin 1 2019 EAP Meeting Documentation
- Montour Ash Basin 1 SSL Notification - Basin 1 December 2018 Event
- Montour Ash Basin 1 SSL Notification - Basin 1 March 2019 Sampling Event
- Montour Ash Basin 1 Annual Fugitive Dust Control Report 2019
- Montour Ash Basin 1 Annual Inspection Report 2020
- Montour Ash Basin 1 Annual Groundwater and Corrective Action Report 2019
- Montour AB1 Emergency Action Plan
- Montour AB1 Emergency Action Plan Certification
- Montour AB1 SSL Notification March 2020
- Montour AB 1 EAP Meeting
- Montour AB 1 2020 Fugitive Report
- Montour Ash Basin 1 Periodic Inflow Design Flood Control System Plan
- Montour Ash Basin 1 Periodic Structural Stability Assessment Report November 2020
- Montour Ash Basin 1 Revised Closure Plan November 2020
- Montour Ash Basin 1 Alternative Closure Demonstration Notice of Intent
- Montour Ash Basin 1 Alternative Closure Demonstration November 2020
- Montour Ash Basin 1 2019 Annual Groundwater Monitoring Corrective Action Report Revised November 2020
- Montour Ash Basin 1 Annual Inspection Report
- Montour Ash Basin 1 Annual Groundwater Monitoring and Corrective Action Report 2020
- 2020 September Sampling Event SSL Notification Basin 1 Montour
- Montour AB1 EAP Meeting 2021
- Revised Mon AB1 History of Construction
- 2021 March Sampling Event Ssl Notification Basin 1 Montour
- Groundwater Monitoring Certification August 2021 Revision Basin 1 Montour
- Montour Ash Basin 1 Periodic Safety Factor Assessment Report October 2021
- Montour Ash Basin 1 Dam Periodic Hazard Potential Classification Assessment Report October 2021
- Montour Ash Basin 1 2021 Fugitive Dust Report
- Montour Ash Basin 1 Notice Of Constituents Above Gwps Basin 1Sept2021 Sampling Event
- Montour Ash Basin 1 Annual Inspection Report 2022
- Montour Ash Basin 1 Annual Groundwater Monitoring and Corrective Action Report 2021
- Montour Ash Basin 1 2022 MON AB1 EAP Meeting
- Montour AB1 2022 March Sampling Event SSL Notification Basin 1 Montour
- Montour Ash Basin 1 Fugitive Dust Report 2022
- Montour AB1 2021 Annual Progress Report Alternate Closure Demonstration
- Montour AB1 2022 Annual Progress Report Alternate Closure Demonstration
- Montour Ash Basin No 1 Annual Inspection 2023
- Montour Ash Basin 1 Annual Groundwater Monitoring and Corrective Action Report 2022
- Montour Ash Basin 1 2022 September Sampling Event SSL Notification
- 2023 MON AB1 EAP Meeting
- Montour Ash Basin 1 2023 March Sampling Event SSL Notification
- Montour AB1 2023 AB1 Fugitive Dust Report
- Montour AB1 2023 Annual Progress Report Alternate Closure Demonstration
- Montour AB1 Annual Inspection Report 2024
- Montour AB1 Annual Groundwater Monitoring and Corrective Action Report 2023
- Montour AB1 Statistical Methods Certification_Revised January 2024
- Montour AB1 2023 September Sampling Event SSL Notification
- Montour AB1 2024 Montour AB1 EAP Meeting
- Montour AB1 2024 March Sampling Event SSL Notification
- Montour AB1 2024 Emergency Action Plan Certification
- Montour AB1 2024 Emergency Action Plan
- Montour AB1 2024 Fugitive Dust Report